Open Context

Daily Log

July 13, 1983

A.M.

  • Tile: ---
  • Pottery: ---

The unfired cover tiles in meters T-W,70-71 continued to be cleaned down with brushes and mestaline.  The floor of the entire trench was swept.  Another tractor load of sand was brought to the site.  This makes a total of 3 tractor loads, plus what was saved from uncovering the sand placed over the "floor" last year.  No more sand will be brought up to site this season.

P.M.

The trench floor continued to be swept.  A 15% PVA emulsion/water solution was painted on the unfired cover tiles discovered this year (meters T,U-70-73, U,V,W-70, and X,Y-71).  The unfired cover tiles discovered last year in U,V,W-71-73 were painted with PVA last year and will not be painted again this year (at least, this is the feeling at the moment).  Work

halted abruptly at 4 P.M. due to rain.

Property or Relation Value(s)
Temporal Coverage
[Standard: Dublin Core Terms]
Editorial Note

Open Context editors work with data contributors to annotate datasets to shared vocabularies, ontologies, and other standards using 'Linked Open Data' (LOD) methods.

The annotations presented above approximate some of the meaning in this contributed data record to concepts defined in shared standards. These annotations are provided to help make datasets easier to understand and use with other datasets.

Suggested Citation

Mark Tobey. "MT VIII (1983-07-13):338-341; Daily Log from Italy/Poggio Civitate/Tesoro/Tesoro 26/1983, ID:116". (2017) In Murlo. Anthony Tuck (Ed.) . Released: 2017-10-04. Open Context. <http://opencontext.org/documents/1765136e-b3ea-4ffd-b5b6-8dcdc88e511e>

Editorial Status

●●●○○
Managing editor reviewed

Part of Project

Murlo

Mapping Data

Copyright License

Attribution 4.0

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)