Open Context

Daily Log

Friday June 17, 1994

AM

We triangulated our trench using a 6-m baseline on the south wall of the Upper Building. We measured in a 6m E/W by 4m N/S area.* The west baulk was a 19m from the est edge of the Upper Building. However when we tried to establish a line of sight between the east baulk of T-25 (4-e/13-19) we discovered that our baulks did not lie on the same N/S 19m line. Unable to determine what the problem was and how to fix it, we decided to begin removing topsoil with pick and shovel and to correct the measurements later.

PM

Maggazino work.

Property or Relation Value(s)
Temporal Coverage
[Standard: Dublin Core Terms]
Editorial Note

Open Context editors work with data contributors to annotate datasets to shared vocabularies, ontologies, and other standards using 'Linked Open Data' (LOD) methods.

The annotations presented above approximate some of the meaning in this contributed data record to concepts defined in shared standards. These annotations are provided to help make datasets easier to understand and use with other datasets.

Suggested Citation

Alison Griffith. "AG II (1994-06-17):15-16; Daily Log from Italy/Poggio Civitate/Tesoro/Tesoro 25 North Extension/1994, ID:107". (2017) In Murlo. Anthony Tuck (Ed.) . Released: 2017-10-04. Open Context. <http://opencontext.org/documents/1a02aba1-468a-41f3-a600-80def73a533d>

Editorial Status

●●●○○
Managing editor reviewed

Part of Project

Murlo

Mapping Data

Copyright License

Attribution 4.0

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)