Open Context

Daily Log Entry for Friday 3 July 2009

DAILY LOG ENTRY FOR FRIDAY 3 JULY 2009

MORNING: No work was done in the trench due to the rains from yesterday and since the soil was still wet. Yesterday evening when reading the trenchbook for SF-4 I realized that our datum point is not 28 m, as previously expected, so we fixed the absolute elevations recorded in the trenchbook.

Afternoon: Trimmed baulk walls in the northern half of the trench for the rest of the day. No closing elevations were taken since no actual digging was done.

FINDS:

Baulk Trim: 36 pcs. terracotta (ca. 1/8 bowl)

5 pcs. ceramic

Property or Relation Value(s)
Temporal Coverage
[Standard: Dublin Core Terms]
Editorial Note

Open Context editors work with data contributors to annotate datasets to shared vocabularies, ontologies, and other standards using 'Linked Open Data' (LOD) methods.

The annotations presented above approximate some of the meaning in this contributed data record to concepts defined in shared standards. These annotations are provided to help make datasets easier to understand and use with other datasets.

Suggested Citation

Joseph R. Vansuch. "JRV II (2009-07-03):51-52; Daily Log Entry for Friday 3 July 2009 from Italy/Poggio Civitate/Tesoro/Tesoro 56/2009, ID:616/Locus 4". (2017) In Murlo. Anthony Tuck (Ed.) . Released: 2017-10-04. Open Context. <http://opencontext.org/documents/2ec30e61-eae6-4053-8aba-1c1d862afe6c>

Editorial Status

●●●○○
Managing editor reviewed

Part of Project

Murlo

Mapping Data

Copyright License

Attribution 4.0

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)