Open Context

Daily Log

Wednesday, July 26, 1978

The wheelbarrow ramp was removed in B-E/52 and the area cleaned down to bedrock.  The large stones noted on Monday in E/53 are pakced against the bedrock with a heavy concentration of carbon immediately to the south.  The final project of the morning extended the cut along the east flank of the trench in A/54 up to the wall of the upper building and down to the level of bedrock.

19780161

19780161

Property or Relation Value(s)
Temporal Coverage
[Standard: Dublin Core Terms]
Editorial Note

Open Context editors work with data contributors to annotate datasets to shared vocabularies, ontologies, and other standards using 'Linked Open Data' (LOD) methods.

The annotations presented above approximate some of the meaning in this contributed data record to concepts defined in shared standards. These annotations are provided to help make datasets easier to understand and use with other datasets.

Suggested Citation

Sarah Leach. "SL I (1978-07-26):101-104; Daily Log from Italy/Poggio Civitate/Tesoro/Tesoro 22/1993, ID:411". (2017) In Murlo. Anthony Tuck (Ed.) . Released: 2017-10-04. Open Context. <http://opencontext.org/documents/3fb326be-a2d5-4d29-8c3e-002fe7e4aa96>

Editorial Status

●●●○○
Managing editor reviewed

Part of Project

Murlo

Mapping Data

Copyright License

Attribution 4.0

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)