Open Context

Daily Log

July 28, 1999

AM

It is decided that, with the end of the season so near, the trench should be shut down at the current depth and work resumed at the onset of next season. The morning is spent defining rocks and trimming baulks. Finals photographs (p ) are taken. The following final depths are taken in meters E125/S21-22, the only meters in which significant work has been done:

sketch of trench

P1: 83 cm bd*

P2: 84 cm bd

P3: 84 cm bd

P4: 80 cm bd

*Reminder that datum was established at 45 cm above surface level.

Property or Relation Value(s)
Temporal Coverage
[Standard: Dublin Core Terms]
Editorial Note

Open Context editors work with data contributors to annotate datasets to shared vocabularies, ontologies, and other standards using 'Linked Open Data' (LOD) methods.

The annotations presented above approximate some of the meaning in this contributed data record to concepts defined in shared standards. These annotations are provided to help make datasets easier to understand and use with other datasets.

Suggested Citation

Tracy C. Bergstrom. "TCB I (1999-07-28):26-27; Daily Log from Italy/Poggio Civitate/Agger/Agger 9 Southern Extension/1999, ID:367". (2017) In Murlo. Anthony Tuck (Ed.) . Released: 2017-10-04. Open Context. <http://opencontext.org/documents/56103a5e-2705-4016-b4e9-57c0a041ee42>

Editorial Status

●●●○○
Managing editor reviewed

Part of Project

Murlo

Mapping Data

Copyright License

Attribution 4.0

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)