Open Context

Daily Log

(2 inserts - baulk wall profiles - not photographed)

July 18, 1996

AM

The section through Locus 9 (galestra) and Locus 10 (yellowish-gray claylike soil) continued this morning. Locus 10 was partially removed to bedrock. Locus 9 is still present at a depth of 95cm.

Today marks the end of excavation of CB 32. The meters W73-74/S34-35 will be covered with plastic and backfilled to protect the area after final have been taken.

Property or Relation Value(s)
Temporal Coverage
[Standard: Dublin Core Terms]
Editorial Note

Open Context editors work with data contributors to annotate datasets to shared vocabularies, ontologies, and other standards using 'Linked Open Data' (LOD) methods.

The annotations presented above approximate some of the meaning in this contributed data record to concepts defined in shared standards. These annotations are provided to help make datasets easier to understand and use with other datasets.

Suggested Citation

Joyce A. Lomas. "JAL I (1996-07-18):122-123; Daily Log from Italy/Poggio Civitate/Civitate B/Civitate B 32/1996, ID:236". (2017) In Murlo. Anthony Tuck (Ed.) . Released: 2017-10-04. Open Context. <http://opencontext.org/documents/5866251f-1850-4494-adbf-9a4a4f4b0b85>

Editorial Status

●●●○○
Managing editor reviewed

Part of Project

Murlo

Mapping Data

Copyright License

Attribution 4.0

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)