Open Context

Daily Log

July 13, 1968

Agger

In order to obtain the complete plan of the large building on Tesoro it was decided to remove that section of the agger flanking the western end of the building, and at the same time to observe the method of construction of the agger (see TG, Book 2, p.91-99).

Agger 1

The agger was cleared of trees and scrub brush.  Work was begun on removing the topsoil from the northern part of the agger for a distance of 8.50m across (N to S).

Property or Relation Value(s)
Temporal Coverage
[Standard: Dublin Core Terms]
Editorial Note

Open Context editors work with data contributors to annotate datasets to shared vocabularies, ontologies, and other standards using 'Linked Open Data' (LOD) methods.

The annotations presented above approximate some of the meaning in this contributed data record to concepts defined in shared standards. These annotations are provided to help make datasets easier to understand and use with other datasets.

Suggested Citation

Penny Small. "PS I (1968-07-13):39-40; Daily Log from Italy/Poggio Civitate/Agger/Agger 2D/1968, ID:467". (2017) In Murlo. Anthony Tuck (Ed.) . Released: 2017-10-04. Open Context. <http://opencontext.org/documents/5a9c6fba-eb5d-42f7-aa18-96a9cd0a0d40>

Editorial Status

●●●○○
Managing editor reviewed

Part of Project

Murlo

Mapping Data

Copyright License

Attribution 4.0

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)