Open Context

Daily Log- 7/7/15

7/7/15

Work has been suspended in T-73. After 3 days of excavation in locus 2 , it has become clear that the stones are bedrock. The closing elevations from Friday will be used and closing photos will be taken after the trench is swept. These will just be precautions taken in case of rain, if needed the trench can be opened again.

Closing Elevations Locus 2

NW- 26.87 mAE NE- 26.98 mAE

SE- 26.82 mAE SW- 26.95 mAE

Property or Relation Value(s)
Temporal Coverage
[Standard: Dublin Core Terms]
Editorial Note

Open Context editors work with data contributors to annotate datasets to shared vocabularies, ontologies, and other standards using 'Linked Open Data' (LOD) methods.

The annotations presented above approximate some of the meaning in this contributed data record to concepts defined in shared standards. These annotations are provided to help make datasets easier to understand and use with other datasets.

Suggested Citation

Andrew J. Carroll. "AJC VII (2015-07-07):49-50; Daily Log 7/7/15 from Italy/Poggio Civitate/Tesoro/Tesoro 73/2015, ID:690/Locus 2". (2017) In Murlo. Anthony Tuck (Ed.) . Released: 2017-10-04. Open Context. <http://opencontext.org/documents/60858c40-0b8f-4e2e-a3f4-8b52a5b51a3c>

Editorial Status

●●●○○
Managing editor reviewed

Part of Project

Murlo

Mapping Data

Copyright License

Attribution 4.0

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)