July 12, 1969

No excavating could be done since the ground was still too wet

T6D

The dump from T2 was removed

Trees were cut in the area between T8 and T6D

T8

Topsoil was taken off from an area 5m wide S-N starting at the S end of the trench, forming the 2nd strip

towards the E of the extension of T8.  2 boxes of tiles were dumped.

Property or Relation Value(s)
Temporal Coverage
[Standard: Dublin Core Terms]
Editorial Note

Open Context editors work with data contributors to annotate datasets to shared vocabularies, ontologies, and other standards using 'Linked Open Data' (LOD) methods.

The annotations presented above approximate some of the meaning in this contributed data record to concepts defined in shared standards. These annotations are provided to help make datasets easier to understand and use with other datasets.

Suggested Citation

Ingrid Edlund. "IE I (1969-07-12):59-61; Daily Log from Italy/Poggio Civitate/Tesoro/Tesoro 6E (2)/1970, ID:442". (2017) In Murlo. Anthony Tuck (Ed.) . Released: 2017-10-04. Open Context. <http://opencontext.org/documents/6556bb61-d94a-4b25-a009-e17310a7ceee>

Editorial Status

●●●○○
Managing editor reviewed

Part of Project

Murlo

Mapping Data

Copyright License

Attribution 4.0

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)