Open Context

Daily Log

July 21

AM

It was decided that excavation should cease in the CB area for the summer. Finished leveling the floor, trimming the baulk walls, sweeping the floor. Some interesting looking flat rocks, appearnt formations of bedrock, were found in the baulks and in some other areas of the trench, but it was decied that these were natural bedding formations of the rocks. Closing photoraphs and elevations taken.

Closing Elevations

NW - 33.98m

NE - 33.83m

SW - 33.99m

SE - 33.71m

A - 33.26m

B - 33.26m

C - 33.25m

D - 33.24m

E - 33.22m

F - 33.22m

G - 33.21m

H - 33.24m

I - 33.15m

Extention

NW- 33.26m

NE- 33.26m

Property or Relation Value(s)
Temporal Coverage
[Standard: Dublin Core Terms]
Editorial Note

Open Context editors work with data contributors to annotate datasets to shared vocabularies, ontologies, and other standards using 'Linked Open Data' (LOD) methods.

The annotations presented above approximate some of the meaning in this contributed data record to concepts defined in shared standards. These annotations are provided to help make datasets easier to understand and use with other datasets.

Suggested Citation

Jason P. Bauer. "JPB IV (2005-07-21):37-38; Daily Log from Italy/Poggio Civitate/Civitate B/Civitate B 34/2005, ID:566". (2017) In Murlo. Anthony Tuck (Ed.) . Released: 2017-10-04. Open Context. <http://opencontext.org/documents/675c95a4-41d3-4c48-b368-9f13d5b7399f>

Editorial Status

●●●○○
Managing editor reviewed

Part of Project

Murlo

Mapping Data

Copyright License

Attribution 4.0

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)