Open Context

Daily Log

MONDAY, JUNE 15

A.M.

The transit was brought up and the baseline cleared. After establishing a line between PC 1 and PC 6 with the transit several points were set north of the area cleared Friday on the base line. From these points a perpendicular line was triangulated to the south to establish one side of the trenches CA 49 and CA 48.

Work was halted just before lunch due to rain.

Property or Relation Value(s)
Temporal Coverage
[Standard: Dublin Core Terms]
Editorial Note

Open Context editors work with data contributors to annotate datasets to shared vocabularies, ontologies, and other standards using 'Linked Open Data' (LOD) methods.

The annotations presented above approximate some of the meaning in this contributed data record to concepts defined in shared standards. These annotations are provided to help make datasets easier to understand and use with other datasets.

Suggested Citation

Alexis M. Christensen. "AMC VIII (1998-06-15):9-10; Daily Log from Italy/Poggio Civitate/Civitate A/Civitate A 49/1998, ID:362". (2017) In Murlo. Anthony Tuck (Ed.) . Released: 2017-10-04. Open Context. <http://opencontext.org/documents/6c0e81cb-b3d6-42e0-acc9-3cff1c3d6ae9>

Editorial Status

●●●○○
Managing editor reviewed

Part of Project

Murlo

Mapping Data

Copyright License

Attribution 4.0

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)