Open Context

Daily Log

July 15, 1994

A.M.

Backfill was removed from meters N6,E1 N5,E1 N5,W1 N,E1, N5,W2 & N6,W2 and the area of the trench defined. Since plastic was not placed over meters N7,E1 N7 or N7,W2 it was difficult to determine where the backfill ended and unexcavated soil begins. As a result, about 2 latte boxes of pottery was accidentally removed along with a small portion of the shelf of the baulk of these meters. The amount of damage to the baulk will be determined later.

19940017

19940017

19940147

19940147

  • Find 3
  • N7, E1 or N7, W1-2 (backfill/washout)
  • Rim with raised, vertical ridge

19940060

19940060

Property or Relation Value(s)
Temporal Coverage
[Standard: Dublin Core Terms]
Editorial Note

Open Context editors work with data contributors to annotate datasets to shared vocabularies, ontologies, and other standards using 'Linked Open Data' (LOD) methods.

The annotations presented above approximate some of the meaning in this contributed data record to concepts defined in shared standards. These annotations are provided to help make datasets easier to understand and use with other datasets.

Suggested Citation

Tony Tuck. "TT IV (1994-07-15):82-85; Daily Log from Italy/Poggio Civitate/Civitate B/Civitate B 29/1993, ID:401". (2017) In Murlo. Anthony Tuck (Ed.) . Released: 2017-10-04. Open Context. <http://opencontext.org/documents/7e4eda32-3c24-4f86-b4ee-bd725fe9de0a>

Editorial Status

●●●○○
Managing editor reviewed

Part of Project

Murlo

Mapping Data

Copyright License

Attribution 4.0

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)