Open Context

Daily Log

17

June 9, 1982

A.M.

Workmen began to clear the brush and shrubs in the area where T26-1982 was to be mapped out.  They continued to clean the entire area along the southern wall of the upper building of brush and shrubs.

T26-1982 was mapped out to incorporate 15 square meters (P-T, 77, 78, 79).  The trench was pegged out with picchetti and work began in removing the topsoil.  A very small amount of tile and pottery was found.

A Tile dump was established in the center of filled in site of T23-1978 while soil is being deposited into T26-1981 (See MT V, pg. 8)

P.M.

No work was done on the site this afternoon

Property or Relation Value(s)
Temporal Coverage
[Standard: Dublin Core Terms]
Editorial Note

Open Context editors work with data contributors to annotate datasets to shared vocabularies, ontologies, and other standards using 'Linked Open Data' (LOD) methods.

The annotations presented above approximate some of the meaning in this contributed data record to concepts defined in shared standards. These annotations are provided to help make datasets easier to understand and use with other datasets.

Suggested Citation

Mark Tobey. "MT V (1982-06-09):17; Daily Log from Italy/Poggio Civitate/Tesoro/Tesoro 26/1982, ID:112". (2017) In Murlo. Anthony Tuck (Ed.) . Released: 2017-10-03. Open Context. <http://opencontext.org/documents/7f6fb097-eb1d-4059-867f-3e3f5184d293>

Editorial Status

●●●○○
Managing editor reviewed

Part of Project

Murlo

Mapping Data

Copyright License

Attribution 4.0

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)