Open Context

Daily Log

16

May 22, 1970

Agger 1

Work was begun on the taller and smaller eastern section of wall and dike.  It was pared down to 1.1 x .55 x .9 m.  The usual tiles and potter plus two fragmentary letters on cover tiles.

Agger 3

Topsoil was removed on the dike.

Rain in the afternoon.

Property or Relation Value(s)
Temporal Coverage
[Standard: Dublin Core Terms]
Editorial Note

Open Context editors work with data contributors to annotate datasets to shared vocabularies, ontologies, and other standards using 'Linked Open Data' (LOD) methods.

The annotations presented above approximate some of the meaning in this contributed data record to concepts defined in shared standards. These annotations are provided to help make datasets easier to understand and use with other datasets.

Suggested Citation

Penny Small. "PS II (1970-05-22):16-18; Daily Log from Italy/Poggio Civitate/Agger/Agger 1/1970, ID:532". (2017) In Murlo. Anthony Tuck (Ed.) . Released: 2017-10-04. Open Context. <http://opencontext.org/documents/858437c1-defd-496d-964d-7d8bb9093150>

Editorial Status

●●●○○
Managing editor reviewed

Part of Project

Murlo

Mapping Data

Copyright License

Attribution 4.0

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)