Open Context

Daily Log

37

July 11

1R Stone pavement finally cleaned. One nail was found. Increased number of sherds, about 1/2 box July 10-11.

19670055

19670055

19670410

19670410

19670413

19670413

1T A new trench was laid out, 1T. Topsoil lifted. Tilebed showed up immediately under the very thin layer of topsoil. A foot was found in the topsoil. The wall continues right through the trench.

1S A new trench was laif out west of 1Q ( ). Topsoil was taken off and pated of red soil began to appear again.

Property or Relation Value(s)
Temporal Coverage
[Standard: Dublin Core Terms]
Editorial Note

Open Context editors work with data contributors to annotate datasets to shared vocabularies, ontologies, and other standards using 'Linked Open Data' (LOD) methods.

The annotations presented above approximate some of the meaning in this contributed data record to concepts defined in shared standards. These annotations are provided to help make datasets easier to understand and use with other datasets.

Suggested Citation

Timothy Gantz. "TG II (1967-07-11):37-39; Daily Log from Italy/Poggio Civitate/Tesoro/Tesoro 1AN/1967, ID:523". (2017) In Murlo. Anthony Tuck (Ed.) . Released: 2017-10-04. Open Context. <http://opencontext.org/documents/87f4870f-bf72-438e-a12f-bd2bbda4679e>

Editorial Status

●●●○○
Managing editor reviewed

Part of Project

Murlo

Mapping Data

Copyright License

Attribution 4.0

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)