Open Context

Daily Log

Friday July 15, 1994

AM

Work began with completing the pick pass begun yesterday in H-I/20-22.  As yesterday, this layer had more tile, carbon, and pottery than the preceding layers.  This layer lay at 70-82cm and appeared at a shallower level in the west than in the eastern part of the trench (i.e. it sloped down from west to east).

After this a meter wide extension to the south was measured out so that we coul excavate down to the level of the stone feature.  Approximatly 10cm of topsoil was removed from I/21-22.

Pottery from H-I/20-22= 1/2 liter box

tile from H-I/20-22= 3/4 cassette

tile from H/21-22= 1 literbox

PM

Work in maggazino

Property or Relation Value(s)
Temporal Coverage
[Standard: Dublin Core Terms]
Editorial Note

Open Context editors work with data contributors to annotate datasets to shared vocabularies, ontologies, and other standards using 'Linked Open Data' (LOD) methods.

The annotations presented above approximate some of the meaning in this contributed data record to concepts defined in shared standards. These annotations are provided to help make datasets easier to understand and use with other datasets.

Suggested Citation

Alison Griffith. "AG II (1994-07-15):79-82; Daily Log from Italy/Poggio Civitate/Tesoro/Tesoro 25 North Extension/1994, ID:107". (2017) In Murlo. Anthony Tuck (Ed.) . Released: 2017-10-04. Open Context. <http://opencontext.org/documents/9190154d-0c5e-48a5-ac5e-558d626052d7>

Editorial Status

●●●○○
Managing editor reviewed

Part of Project

Murlo

Mapping Data

Copyright License

Attribution 4.0

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)