Open Context

Daily Log

July 25, 1975

The last day of excavation?  Cut 5 was cleaned down: the profiles were straightened and readied for drawing.

In T-18, grid J/26, the tile fall was lifted.  Underneath the large pan tile, another almost complete pan tile was discovered.  The latter was consolidated and left in the earth to harden.

Property or Relation Value(s)
Temporal Coverage
[Standard: Dublin Core Terms]
Editorial Note

Open Context editors work with data contributors to annotate datasets to shared vocabularies, ontologies, and other standards using 'Linked Open Data' (LOD) methods.

The annotations presented above approximate some of the meaning in this contributed data record to concepts defined in shared standards. These annotations are provided to help make datasets easier to understand and use with other datasets.

Suggested Citation

Gregory Warden. "GW III (1975-07-25):148-149; Daily Log from Italy/Poggio Civitate/Tesoro/Tesoro 19/1975, ID:78". (2017) In Murlo. Anthony Tuck (Ed.) . Released: 2017-10-04. Open Context. <http://opencontext.org/documents/9bf13cee-e49d-47ec-8957-179bc8a3b71b>

Editorial Status

●●●○○
Managing editor reviewed

Part of Project

Murlo

Mapping Data

Copyright License

Attribution 4.0

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)