Daily Log

July 9, 1991

A.M.

The trench area was raked and cleared of brush.  The trench grid was then reestablished by triangulating down the hill from the fixed point located directly above the road (for the location of the fixed point see CA33 Final Trench Plan, G. Soderberg - 9001).  Next, the backfill above the protectie plastic began to be removed in meters G-I/10-12 and G-K/13-16.  A few small pieces of worn tile, which probably had eroded from the trench baulk, were found in the back fill soil.

Property or Relation Value(s)
Temporal Coverage
[Standard: Dublin Core Terms]
Editorial Note

Open Context editors work with data contributors to annotate datasets to shared vocabularies, ontologies, and other standards using 'Linked Open Data' (LOD) methods.

The annotations presented above approximate some of the meaning in this contributed data record to concepts defined in shared standards. These annotations are provided to help make datasets easier to understand and use with other datasets.

Suggested Citation

Jon Berkin. "JB III (1991-07-09):147; Daily Log from Italy/Poggio Civitate/Civitate A/Civitate A 33/1991, ID:198". (2017) In Murlo. Anthony Tuck (Ed.) . Released: 2017-10-04. Open Context. <http://opencontext.org/documents/af90e761-1ad4-48ee-a0c8-ca7a0b56adca>

Editorial Status

●●●○○
Managing editor reviewed

Part of Project

Murlo

Mapping Data

Copyright License

Attribution 4.0

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)