Open Context

Daily Log

July 23, 1976

Work continued on cut #3, grids N-O 40-42, on the yellow earth stratum.  Work also continued on grids I 38-42, and on the middle room.  In the middle room grids O-P 32-37 were cleaned.  The concentration of coarseware in grids JK 31-35 was covered with plastic sheeting and the trench was refilled with earth.  The area is being left for another season, when there is time for excavation and appropriate storeroom space.  Two boxes of pottery taken uot of this area will be boxed and stored.

19760127

19760127

I casette of tile dumped.

There is no page 165

9 AM- work discontinued because of rain.

19760146

19760146
Property or Relation Value(s)
Temporal Coverage
[Standard: Dublin Core Terms]
Editorial Note

Open Context editors work with data contributors to annotate datasets to shared vocabularies, ontologies, and other standards using 'Linked Open Data' (LOD) methods.

The annotations presented above approximate some of the meaning in this contributed data record to concepts defined in shared standards. These annotations are provided to help make datasets easier to understand and use with other datasets.

Suggested Citation

Gregory Warden. "GW IV (1976-07-23):162-166; Daily Log from Italy/Poggio Civitate/Tesoro/Tesoro 19 Extension/1976, ID:79". (2017) In Murlo. Anthony Tuck (Ed.) . Released: 2017-10-04. Open Context. <http://opencontext.org/documents/d55e3fe1-30e2-4bf8-82af-06e5083e8638>

Editorial Status

●●●○○
Managing editor reviewed

Part of Project

Murlo

Mapping Data

Copyright License

Attribution 4.0

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)