Wednesday July 20, 1994

AM

It was decided not to excavate any further in I/20-22 so as not to weaken the wall.  Instead, excavation continued in H/I 23-24.  First a stump was removed in I/24.  Very little material was recovered from the roots.

pottery= 1/4 liter box

tile= 1/4 liter box

After the stump was removed work began on removing fill from trench T-6b in H-I/23-24.  About 5 cm had been removed when digging ended for the day.

A big rainstorm ended the day.

PM

Work in the maggazino.

Property or Relation Value(s)
Temporal Coverage
[Standard: Dublin Core Terms]
Editorial Note

Open Context editors work with data contributors to annotate datasets to shared vocabularies, ontologies, and other standards using 'Linked Open Data' (LOD) methods.

The annotations presented above approximate some of the meaning in this contributed data record to concepts defined in shared standards. These annotations are provided to help make datasets easier to understand and use with other datasets.

Suggested Citation

Alison Griffith. "AG II (1994-07-20):88-90; Daily Log from Italy/Poggio Civitate/Tesoro/Tesoro 25 North Extension/1994, ID:107". (2017) In Murlo. Anthony Tuck (Ed.) . Released: 2017-10-04. Open Context. <http://opencontext.org/documents/da1f99ed-b283-4f26-81c1-3ed7d42be3ad>

Editorial Status

●●●○○
Managing editor reviewed

Part of Project

Murlo

Mapping Data

Copyright License

Attribution 4.0

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)