Open Context

Daily Log

June 25, 1980

A.M.

The winter erosion in T23:1979 Extentions (meters C-CC, 14-16) was cleaned along the west, south, and east walls.  Along the north there is a "step" of approximately 20 cm. above the floor level of the trench and a 10 cm. section (moving north) was taken from this.  This "step" contains tile and stone.  It should be noted that pithos fragments were found in various parts of the trench.

This trench is being cleaned in order that it may be photographed and drawn.

Property or Relation Value(s)
Temporal Coverage
[Standard: Dublin Core Terms]
Editorial Note

Open Context editors work with data contributors to annotate datasets to shared vocabularies, ontologies, and other standards using 'Linked Open Data' (LOD) methods.

The annotations presented above approximate some of the meaning in this contributed data record to concepts defined in shared standards. These annotations are provided to help make datasets easier to understand and use with other datasets.

Suggested Citation

Matthew Caras. "MC III (1980-06-25):268-271; Daily Log from Italy/Poggio Civitate/Tesoro/Tesoro 23 Extension/1980, ID:391". (2017) In Murlo. Anthony Tuck (Ed.) . Released: 2017-10-04. Open Context. <http://opencontext.org/documents/e624d407-043d-4c1d-bc94-1fa4b03c107e>

Editorial Status

●●●○○
Managing editor reviewed

Part of Project

Murlo

Mapping Data

Copyright License

Attribution 4.0

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)