Trench Layout

Trench Layout.

CB 54 was laid out using triangulation. A straight line was made with a tape between two nails previously placed by the site architect (50E, 49S and 55E, 49S), a nail was placed 4 meters east of 50E, 49S at 54E, 49S. Using this new line, 2 more points were placed through triangulation at 54E, 52S and 50E, 52S. These points were used to create straight lines and extend the southern baulk wall by 1 meter. The Coordinates of the trench, CB 54, are:

NW- 50E, 49S

NE- 54E, 49S

SE- 54E, 53S

SW- 50E, 53S.

Property or Relation Value(s)
Temporal Coverage
[Standard: Dublin Core Terms]
Editorial Note

Open Context editors work with data contributors to annotate datasets to shared vocabularies, ontologies, and other standards using 'Linked Open Data' (LOD) methods.

The annotations presented above approximate some of the meaning in this contributed data record to concepts defined in shared standards. These annotations are provided to help make datasets easier to understand and use with other datasets.

Suggested Citation

Andrew J. Carroll. "AJC III (2012-06-18):15-18; Trench Layout from Italy/Poggio Civitate/Civitate B/Civitate B 54/2012, ID:648". (2017) In Murlo. Anthony Tuck (Ed.) . Released: 2017-10-04. Open Context. <http://opencontext.org/documents/e88b9771-0e13-4a64-86b6-8a389116ce0a>

Editorial Status

●●●○○
Managing editor reviewed

Part of Project

Murlo

Mapping Data

Copyright License

Attribution 4.0

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)