Open Context

Daily Log

Daily Log

Monday, July 11, 2011

AM

CB 38 will be re-opened in the 2011 excavation season, in order to clarify the nature of the dark, bluish claylike soil of Locus 4 that was uncovered in 2011. Backfill was removed from the trench.

PM

Backfill continued to be removed in preparation for reopening CB 38. Soil was dumped in 2 closed trenches from 2010, CB 35 and CB 40.

Property or Relation Value(s)
Temporal Coverage
[Standard: Dublin Core Terms]
Editorial Note

Open Context editors work with data contributors to annotate datasets to shared vocabularies, ontologies, and other standards using 'Linked Open Data' (LOD) methods.

The annotations presented above approximate some of the meaning in this contributed data record to concepts defined in shared standards. These annotations are provided to help make datasets easier to understand and use with other datasets.

Suggested Citation

Fredrik G. Tobin. "FGT I (2011-07-11):109-110; Daily Log from Italy/Poggio Civitate/Civitate B/Civitate B 38/2011, ID:637". (2017) In Murlo. Anthony Tuck (Ed.) . Released: 2017-10-04. Open Context. <http://opencontext.org/documents/ea0ca0d9-4c1f-47e5-8cd5-d4edcf784ed5>

Editorial Status

●●●○○
Managing editor reviewed

Part of Project

Murlo

Mapping Data

Copyright License

Attribution 4.0

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)