Daily Log

39

July 4, 1969

T8

During the afternoon of the Palio-day the remaining dirt from the dump placed E of T8 had been removed for about 10m by 18.30 m.  This area is an extension of T8 and will be excavated as one big complex.  Bedrock is close to the surface already in the topsoil.

T5E

Work was resumed in the testcut, the W part of the cut proved unproductive.

T6D

In order to clarify the wall uncovered in 1968 in complex T6 ( see TG trenchbook 3 p. 52 ) a new trench was opened adjoining to T6B.  This will be called T6D.  It measures 12m E-W and N-S 13.50m.

Topsoil was taken off starting in the center of the trench.  A dike was left on the border to T6C to allow for the wheel-barrow to pass.

2 boxes of tiles were dumped.  2 pieces of cornice were found in the topsoil.

Property or Relation Value(s)
Temporal Coverage
[Standard: Dublin Core Terms]
Editorial Note

Open Context editors work with data contributors to annotate datasets to shared vocabularies, ontologies, and other standards using 'Linked Open Data' (LOD) methods.

The annotations presented above approximate some of the meaning in this contributed data record to concepts defined in shared standards. These annotations are provided to help make datasets easier to understand and use with other datasets.

Suggested Citation

Ingrid Edlund. "IE I (1969-07-04):39-41; Daily Log from Italy/Poggio Civitate/Tesoro/Tesoro 6E (2)/1970, ID:442". (2017) In Murlo. Anthony Tuck (Ed.) . Released: 2017-10-04. Open Context. <http://opencontext.org/documents/eb3cf4bd-75aa-49e8-b38c-302ac2ae6794>

Editorial Status

●●●○○
Managing editor reviewed

Part of Project

Murlo

Mapping Data

Copyright License

Attribution 4.0

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)