Open Context

Daily Log

June 19, 1996

AM

Work began this morning with a trench clean-up in meters ABC/2,3. The area was scraped flat then swept clean. Five pottery sherds were recovered.

Initiated and completed a cut in ABC/2 to confirm the presence of galestra. After these meters are scraped and swept meters ABC/2 will be shut down. The maximum depth is 70cm.

The morning continued with baulk trim of the North, East and South baulks.

June 19, 1996

PM

Completed the baulk trim that we began this morning. The North baulk of C/2,3,4 was trimmed and yielded no pottery. The East baulk of ABC/4 was trimmed and yielded 6 pottery sherds. The south baulk of A/2,3,4 was trimmed and yielded 10 pottery sherds.

Began and completed a cut in ABC/3 to bring the trench floor down to 70cm. Galestra was present throughout.

Property or Relation Value(s)
Temporal Coverage
[Standard: Dublin Core Terms]
Editorial Note

Open Context editors work with data contributors to annotate datasets to shared vocabularies, ontologies, and other standards using 'Linked Open Data' (LOD) methods.

The annotations presented above approximate some of the meaning in this contributed data record to concepts defined in shared standards. These annotations are provided to help make datasets easier to understand and use with other datasets.

Suggested Citation

Joyce A. Lomas. "JAL I (1996-06-19):28-31; Daily Log from Italy/Poggio Civitate/Civitate B/Civitate B 32/1996, ID:236". (2017) In Murlo. Anthony Tuck (Ed.) . Released: 2017-10-04. Open Context. <http://opencontext.org/documents/f0dd22b3-e694-4c23-b9cc-98fd7184790b>

Editorial Status

●●●○○
Managing editor reviewed

Part of Project

Murlo

Mapping Data

Copyright License

Attribution 4.0

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)