Open Context

June 10, 1969

1

Tuesday

More trees were cut, and a trench laid out tentatively, stretching from the E end of the dump towards the agger, with the same width  as CA2. A dike (6m wide) was left between the edge of the dump adn the new trench, and work was started along the southern side of the trench.

Topsoil was taken off and there appeared a number of large stones which seemed to be natural rock. The topsoil produced 1 box of tile fragments and 1 fragment of a lateral sima with one ear of the waterspout preserved.

Property or Relation Value(s)
Temporal Coverage
[Standard: Dublin Core Terms]
Editorial Note

Open Context editors work with data contributors to annotate datasets to shared vocabularies, ontologies, and other standards using 'Linked Open Data' (LOD) methods.

The annotations presented above approximate some of the meaning in this contributed data record to concepts defined in shared standards. These annotations are provided to help make datasets easier to understand and use with other datasets.

Suggested Citation

Mary Berg. "MB I (1969-06-10):1-3; June 10, 1969 from Italy/Poggio Civitate/Agger/Agger 8/1969, ID:264". (2017) In Murlo. Anthony Tuck (Ed.) . Released: 2017-10-04. Open Context. <http://opencontext.org/documents/fa66e5e9-a9cf-4316-be94-1cd7cb81d570>

Editorial Status

●●●○○
Managing editor reviewed

Part of Project

Murlo

Mapping Data

Copyright License

Attribution 4.0

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)