Open Context

Daily Log Entry for Friday, 31 July 2009

DAILY LOG ENTRY FOR FRIDAY, 31 JULY 2009

Closing photos of Tesoro 56 were taken first thing in the morning. Tony Tuck inspected the trench & approved that it be closed.

At 9:47 AM, trench Tesoro 56 was officially closed. The trench was then backfilled w/ dirt produced from the excavation of T-55 & T-56. A piece of clear plastic tarp was laid on top of the floor & the N baulk. Only dirt was used to backfill the trench, the rocks & terracotta roofing tiles were left in their respective piles on site. Tesoro 56 was completely backfilled to the tops of the baulks.

Property or Relation Value(s)
Temporal Coverage
[Standard: Dublin Core Terms]
Editorial Note

Open Context editors work with data contributors to annotate datasets to shared vocabularies, ontologies, and other standards using 'Linked Open Data' (LOD) methods.

The annotations presented above approximate some of the meaning in this contributed data record to concepts defined in shared standards. These annotations are provided to help make datasets easier to understand and use with other datasets.

Suggested Citation

Joseph R. Vansuch. "JRV II (2009-07-31):189-190; Daily Log Entry for Friday, 31 July 2009 from Italy/Poggio Civitate/Tesoro/Tesoro 56/2009, ID:616". (2017) In Murlo. Anthony Tuck (Ed.) . Released: 2017-10-04. Open Context. <http://opencontext.org/documents/fb3cc208-63e6-4c31-a60c-81f08ed15249>

Editorial Status

●●●○○
Managing editor reviewed

Part of Project

Murlo

Mapping Data

Copyright License

Attribution 4.0

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)